Create a project plan

Created: 2026-08-21 · Updated: 2026-08-25

The project plan panel draws a timeline with task bars and milestones as native PowerPoint shapes — not a picture, but individual shapes you can select, move and format.


Opening

On the ribbon, go to PPPTools → "Tools" group and click Project plan. The panel opens on the right.


The tabs

Tab Contents
Period From/to or start + duration, start of fiscal year, week rule, label language, status line
Headers Which levels the timeline shows (fiscal year, calendar year, half-year, quarter, month, calendar week, day) — including order, font and colors per level
Tasks The task list itself: bars and milestones, indentation, owners, custom bar colors, predecessors/dependencies, task numbers
Layout Column grid proportional or equal width, text column width, "fit to slide width", color scheme
Legend Legend entries; colors can be taken from the finished plan
Import Read tasks in from text, from the clipboard or from a file

At the top of the first tab sits the template bar: save, apply and delete complete settings as a named template.

The two action buttons Create new and Update are fixed at the bottom. "Update" changes a plan that already exists instead of drawing a second one next to it.


Moving tasks

In the Tasks tab every task has a grip ⠿ on the left. Drag it up or down to move the task with its sub-tasks (the following tasks that are indented further); drag left or right to change the indent. Entries under "Predecessor" are rewritten to the new task numbers, so dependencies stay intact.

With the keyboard: put the cursor in the task title and press Alt+↑ / Alt+↓ — the task jumps past its neighbor on the same level, sub-tasks included.


Dependencies: move dependent tasks along

Tasks can have predecessors (the "Predecessor" field on the Tasks tab, entered as task numbers). So that a plan holds together when dates change, the checkbox "Move dependent tasks along" sits below the task list — on by default.

When it is active and a task's start or end changes, its successors move along by the same number of days — start and end together. Duration and the gap you set are therefore preserved. This works both ways in:

  • when you type a new date in the task pane, and
  • with "Read from slide" after you have dragged a bar on the slide.

It works in both directions: pull a task earlier or shorten it, and the chain moves forward too.

How the chain moves

  • If a task hangs off several shifted predecessors, the most cautious (smallest) shift wins, and the task is moved exactly once.
  • Predecessor cycles (A depends on B, B on A) are detected, skipped and reported.
  • The status line tells you what happened after each change. The "Undo move-along" button then appears — it reverts only the cascade. Anything you typed yourself or dragged on the slide stays put.

Display ≠ plan

The switch is independent of "Draw dependency arrows". Whether arrows are drawn is pure display; whether the dates are linked is the plan. So you can have dates move along without showing arrows — and the other way round.

A gap model, not a scheduling constraint

PPPTools keeps the gap you placed between predecessor and successor. It does not force a seamless hand-off and does not calculate working days or resources — it shifts the chain by the same delta.


Task numbers on the slide

The "Show task numbers" switch on the Tasks tab puts each task's list number in front of it — exactly the number you enter under "Predecessor". That lets you talk through a printed or projected plan without tracing the dependency arrows with your finger.

  • In the table this creates a narrow column of its own to the left of the title. Set its heading in the "'No.' column" field (default "No."; leave empty for no heading).
  • In the "blocks only" layout (and when the text column is hidden) the number appears before the title inside the block, or next to the milestone diamond.

Text column too narrow

If the text column is too narrow for a number column, the numbers stay off and the status line says so. Widen the text column (Layout tab) or reduce the font size.


On this slide: Load and Remove

The "On this slide" bar lists the plans on the current slide.

  • Load brings a plan's settings, stored in the document, back into the panel.
  • Remove deletes — after a prompt — all shapes of the selected plan together with its settings stored in the document.

Why a dedicated 'Remove' button?

PowerPoint's Ctrl+Z will not undo a plan made of hundreds of shapes in one step, and doing it by hand easily leaves fragments behind that reappear on the next "Update". "Remove" clears it out cleanly. What is set in the task pane stays — "Create new" turns it back into a plan.

Duplicating a slide with a plan

When a slide with a plan is duplicated, the original and the copy used to share a single set of settings — editing the copy silently overwrote the original.

Now the plan you are currently editing becomes independent automatically on the first update: it gets its own settings, the other version is left unchanged, and the status line names the slide number.

Copy within the same slide

A plan you copy within the same slide will still collapse into one on the next "Update". To duplicate a plan, duplicate the slide.


Accessibility

Every generated plan automatically gets a description (alt text for the plan group): period, number of tasks and milestones, work status, deadline and the top outline level — in the label language — by default the output language, but the plan can also be pinned to German or English. PowerPoint's Accessibility Checker therefore no longer flags it here; it used to read just "Group". The text is rewritten on every update. (A detailed alt text per individual bar is deliberately not provided.)


License

Without a Pro license: one new plan per day

Only creating a new plan is limited — one per day. Updating an existing plan, moving dependent tasks along, task numbers, "Remove" and all settings are freely available. With a Pro license the limit no longer applies.